System of indicators for assessing the effectiveness of construction control at individual housing construction facilities

Authors

  • Alexander P. Lyvin National Research Moscow State University of Civil Engineering, 129337, Moscow, Yaroslavskoye Highway, 26
  • Alexander S. Perunov https://orcid.org/0000-0001-5982-2672 National Research Moscow State University of Civil Engineering, 129337, Moscow, Yaroslavskoye Highway, 26

How to cite

GOST Lyvin A. P., Perunov A. S. System of indicators for assessing the effectiveness of construction control at individual housing construction facilities // STROITEL'NYE I DOROZHNYE MASHINY. 2026. Vol. 70. No. 10. P. 24-33. DOI: 10.25726/s2580-3953-0802-g
APA Lyvin, A. P. & Perunov, A. S. (2026). System of indicators for assessing the effectiveness of construction control at individual housing construction facilities. STROITEL'NYE I DOROZHNYE MASHINY, 70(10), 24-33. https://doi.org/10.25726/s2580-3953-0802-g

Abstract

This study examines the evaluation of construction supervision in individual housing projects. Its objective is to develop a set of interrelated indicators for assessing inspection outcomes, the timely correction of defects, the completeness of construction records, and supervision costs. The approach combines the classification of indicators, descriptive comparison, and calculation of relative measures. The source material presents a two-storey residential building with a floor area of 180 m² and compares its indicators with average values for five other housing projects. For the case building, the reported conformity of inspected operations is 96%, documentation completeness is 98%, and timely correction of recorded issues is 92%. Supervision costs amount to RUB 185,000, equivalent to 2.18% of the construction budget; together with rework costs, the total is RUB 230,000, or 2.71%. The findings illustrate why inspection coverage and safety-critical checks should be reported separately when interpreting aggregate percentages. The proposed indicator set can support stage-by-stage monitoring and the identification of organisational improvements. The comparison is descriptive: differences between the projects do not establish that supervision caused the observed variation in rework costs. The availability of underlying inspection records remains an important limitation.

Keywords

construction supervision individual housing construction performance evaluation construction quality defect correction construction documentation supervision costs monitoring

Funding

The authors did not declare any external funding for this research.

References

Baulin A.V., Zhou B. Implementation of the conceptual framework for assessing construction control and supervision of operations at construction sites // Engineering Journal of Don. 2025. no. 7 (127). pp. 539-555.

Gaido A.N., Pogoda A.G. Modern methods of conducting construction control // Engineering Journal of Don. 2024. no. 2 (110). pp. 491-505.

Gareev I.F., Khafizov A.F. Implementation of a certification system for individual housing construction facilities as a tool for increasing housing affordability and ensuring construction quality // Housing Strategies. 2020. vol. 7. no. 4. pp. 455-484.

Urban Planning Code of the Russian Federation of December 29, 2004 No. 190-FZ // consultant.ru. 2004.

Dmitriev V.A., Bogdanov A.N. Construction of individual residential houses. Errors and recommendations // Components of Scientific and Technological Progress. 2024. no. 8(98). pp. 11-17.

Mishchenko V.Ya., Bredikhina N.V., Semenov A.L. Application of the rating and image-based approach in organizing construction control and forming an information model of a capital construction facility // Scientific Journal of Construction and Architecture. 2023. no. 4 (72). pp. 82-92.

Myznikova M.A. Methodological foundations for assessing the effectiveness of the construction complex management system // Human Progress. 2024. vol. 10. no. 9. pp. 10.

Resolution of the Government of the Russian Federation of June 21, 2010 No. 468 “On the procedure for conducting construction control during construction, reconstruction and capital repair of capital construction facilities” // garant.ru. 20210.

SP 543.1325800.2024. Construction control during construction, reconstruction and capital repair of capital construction facilities. Approved by Order of the Ministry of Construction of Russia dated December 27, 2024 No. 950/pr. Entered into force January 28, 2025 // protect.gost.ru. 2024.

Trifonov N.V., Konvisarova E.V. Construction organization's budget based on the principles of lean production // Housing Strategies. 2023. vol. 10. no. 4. pp. 499-515.

Faraji A., Rashidi M., Meydani Haji Agha T., Rahnamayiezekavat P., Samali B. Quality management framework for housing construction in a design-build project delivery system: a BIM-UAV approach // Buildings. 2022. Vol. 12. no. 5. Article 554.

Love P.E.D., Ackermann F., Carey B., Morrison J., Ward M., Park A. Praxis of rework mitigation in construction // Journal of Management in Engineering. 2016. Vol. 32. no. 5. Article 05016010. System of indicators for evaluating the effectiveness of construction supervision at individual housing construction sites

Issue

Section

CONSTRUCTION AND ARCHITECTURE

Metrics

13 views
0 downloads
Want to publish with us?
Submit an article

Similar Articles

<< < 2 3 4 5 6 7 8 9 > >> 

You may also start an advanced similarity search for this article.